Verified self-owned case studyHalo website rebuild
A full commercial and engineering rebuild that replaced a bloated, misleading and failure-prone site with a focused, measurable release system.
Halo rebuilt and operates this website
Proof type: Measured first-party delivery evidence
Status: Before/after technical evidence is published; commercial outcomes are not claimed
Evidence checked: 1 August 2026
Boundary: No traffic, ranking, lead or revenue uplift is claimed.
Capability shown: Positioning, UX, content, accessibility, lead capture, edge engineering, deployment and verification
Studio-operated publicationMoghrey Mie
An Isle of Man morning briefing combining local news, public information, events, tides and weather.
Independent editorial operation run by David Shelley
Proof type: Studio-operated public surface
Status: Live morning briefing, archive and publishing surface
Evidence checked: 29 July 2026
Boundary: The public surface does not prove audience size, delivery reach or search performance.
Capability shown: Editorial automation, archive, feeds and delivery operations